Selamat Datang di
TAMBANG EMAS & NIKEL - GOLD & NICKEL MINING

Anggota Gratis
TAMBANG EMAS & NIKEL - GOLD & NICKEL MINING
TAMBANG EMAS & NIKEL - GOLD & NICKEL MINING
Indonesia
  • Katalog Produk

    TAMBANG NIKEL / NICKEL MINING

    TAMBANG NIKEL / NICKEL MINING

    Harga:
    US $ 200.000
    Jumlah Pesanan:
    Negara Asal:
    Indonesia
    Cara Pembayaran:
    Transfer Bank (T/T)
    Kemas & Pengiriman:
    Bulk

    Keterangan :

    Nickel mining and nickel deposit available for sale.

    Total area 100 hectares and expandable and able to be enlarged up to 500 hectares.

    Nickel ore deposit more than 1.000.000 metric tons.
    Current price is USD 50 per metric ton FOB barge.
    Monthly production capacity up to 90, 000 metric tons.
    Monthly production sales is equal to USD 90, 000 x $ 50 = $ 4, 500, 000.

    Location: Central Sulawesi, Indonesia.

    On going mining activities at the surrounding area.

    Advantages:
    Near seaport, less than 1 km.
    Mining legal permit assistance.
    Technical assitance for mining.

    We are looking for a serious business partner who intent to deal and invest in the nickel mining with huge potential R.O.I. Please find attached the business proposal, and with pleasure to hear from you soon.

    Please contact us for more details.

    BUSINESS PROPOSAL – summary DASA GOLD - INDONESIA

    Business category NICKEL MINING ( PERTAMBANGAN NIKEL) .

    Mining area: 100 hectares, expandable
    Mining area: 1, 000, 000 m2.
    Mining grade valueable: 1.8% up

    Location in INDONESIA:
    Kabupaten Morowali, Central Sulawesi Province.
    Kabupaten Kolaka, Southeast Sulawesi Province.

    Investment stage 1: US$ 200, 000
    Cost allocation 1: Survey, measurement, study. Drilling, testing, mapping. Legal permit, IUP. Design.

    Mining deposit: 1, 000, 000 metric ton ( minimal)
    Unit price ( FOB barge) : $ 50.00 per metric ton.

    Deposit value: US$ 50, 000, 000
    Net profit: US$ 15, 000, 000, 30%

    When investment stage 1 accomplished, investor has two options ie: to sell the mining with 200% profitable value and/ or to continue to mine in production stage.

    Capital fund ( investmen stage 2) : US$ 10, 000, 000
    Cost allocation 2: Office building, basecamp, warehouse, workshop, road, path, seaport. Equipment: excavator, wheel loader, grader, bulldozer, trucks.
    HR: manpower, labor. ICT, office equipment, cars.

    Production capacity ( monthly) : 90, 000 metric ton.
    Total monthly price/ sales : US$ 4, 500, 000
    Production capacity ( daily) : 3000 metric ton, 150.00trp

    Total business period: 24 month.
    Preliminary/ preparation period: 3, Pre-production: 4, Production: 12, Post production: 3 months.

    Cost composition ( avr) :
    Land compensation: $ 10, 20.00% , US$ 10, 000, 000
    Tool, equipment: $ 5, 10.00% , US$ 5, 000, 000
    Human resources: $ 5, 10.00% , US$ 5, 000, 000
    Legal permit, IUP, taxes: $ 2 4.00% , US$ 2, 000, 000
    Infrastructure: $ 3 6.00% US$ 3, 000, 000
    Others: $ 5 10.00% US$ 5, 000, 000
    Profit: $ 20, 40.00% , US$ 20, 000, 000
    Total: $ 50, 100.00% , US$ 50, 000, 000

    For detail information, please contact:
    Mr. Ricky Dasa Phone: 0812 4800 6588
    Email dasa.gold@ gmail.com
    Address: Jl. Bangunan Barat no. 15, Jakarta 13210
    IDR/ USD Currency note: 9, 000.00



Anda mendapat [3] permintaan baru.
Ke Menu Anggota

Depan - Penawaran Dagang - Daftar Produk - Daftar Permintaan - Daftar Kerjasama - Daftar Perusahaan
© 2024 Indotrade.com. Hak Cipta Dilindungi Undang-undang.