Keterangan :
Nickel mining and nickel deposit available for sale.
Total area 100 hectares and expandable and able to be enlarged up to 500 hectares.
Nickel ore deposit more than 1.000.000 metric tons.
Current price is USD 50 per metric ton FOB barge.
Monthly production capacity up to 90, 000 metric tons.
Monthly production sales is equal to USD 90, 000 x $ 50 = $ 4, 500, 000.
Location: Central Sulawesi, Indonesia.
On going mining activities at the surrounding area.
Advantages:
Near seaport, less than 1 km.
Mining legal permit assistance.
Technical assitance for mining.
We are looking for a serious business partner who intent to deal and invest in the nickel mining with huge potential R.O.I. Please find attached the business proposal, and with pleasure to hear from you soon.
Please contact us for more details.
BUSINESS PROPOSAL – summary DASA GOLD - INDONESIA
Business category NICKEL MINING ( PERTAMBANGAN NIKEL) .
Mining area: 100 hectares, expandable
Mining area: 1, 000, 000 m2.
Mining grade valueable: 1.8% up
Location in INDONESIA:
Kabupaten Morowali, Central Sulawesi Province.
Kabupaten Kolaka, Southeast Sulawesi Province.
Investment stage 1: US$ 200, 000
Cost allocation 1: Survey, measurement, study. Drilling, testing, mapping. Legal permit, IUP. Design.
Mining deposit: 1, 000, 000 metric ton ( minimal)
Unit price ( FOB barge) : $ 50.00 per metric ton.
Deposit value: US$ 50, 000, 000
Net profit: US$ 15, 000, 000, 30%
When investment stage 1 accomplished, investor has two options ie: to sell the mining with 200% profitable value and/ or to continue to mine in production stage.
Capital fund ( investmen stage 2) : US$ 10, 000, 000
Cost allocation 2: Office building, basecamp, warehouse, workshop, road, path, seaport. Equipment: excavator, wheel loader, grader, bulldozer, trucks.
HR: manpower, labor. ICT, office equipment, cars.
Production capacity ( monthly) : 90, 000 metric ton.
Total monthly price/ sales : US$ 4, 500, 000
Production capacity ( daily) : 3000 metric ton, 150.00trp
Total business period: 24 month.
Preliminary/ preparation period: 3, Pre-production: 4, Production: 12, Post production: 3 months.
Cost composition ( avr) :
Land compensation: $ 10, 20.00% , US$ 10, 000, 000
Tool, equipment: $ 5, 10.00% , US$ 5, 000, 000
Human resources: $ 5, 10.00% , US$ 5, 000, 000
Legal permit, IUP, taxes: $ 2 4.00% , US$ 2, 000, 000
Infrastructure: $ 3 6.00% US$ 3, 000, 000
Others: $ 5 10.00% US$ 5, 000, 000
Profit: $ 20, 40.00% , US$ 20, 000, 000
Total: $ 50, 100.00% , US$ 50, 000, 000
For detail information, please contact:
Mr. Ricky Dasa Phone: 0812 4800 6588
Email dasa.gold@ gmail.com
Address: Jl. Bangunan Barat no. 15, Jakarta 13210
IDR/ USD Currency note: 9, 000.00